Shea’s in heavily investing in its 710 Theatre at the corner of Main and W. Tupper streets. The $5 million project will transform the public spaces at the theater, improving accessibility, expanding performance opportunities, and significantly enhancing the visitor experience.


“This project at Shea’s 710 Theatre continues our vision of creating a more exciting, dynamic, and vibrant space in Shea’s theatres and throughout Buffalo’s Theatre District,” said Shea’s President and CEO Brian Higgins. “As a historic, iconic and anchor institution, Shea’s can be a catalyst in elevating this block as a year-round destination – a goal that benefits the neighborhood, community, and region.”

The most dramatic transformation of the project will be the creation of a two-story lounge and cabaret (above), which will open to a new seasonal patio on Main Street. Featuring soaring two-story glazing within the building’s iconic arches, the space will include a bar, stage, and seating for up to 100. The design draws inspiration from the building’s mid-century architecture and the theater’s unique history. The new space will provide exciting opportunities for activation before, after, and beyond the theater’s productions.

A new multipurpose room (above) will allow Shea’s to provide, for the first time ever, an arts education space that is handicap accessible. The flexible space can also be used for event rentals, pre/post-show receptions, community events, and cabaret overflow seating.

Also planned are updated restrooms, box office, coat check, and concession areas with new fixtures, technology and ADA compliant counter-height service points. Investments also include a new roof and HVAC mechanics as well as improved water and lighting system efficiencies.
On the exterior, new two-story glazing in the lounge and cabaret, facing Main Street, will serve to both entice and invite the public inside. A seasonal patio at the base of this glazing will extend the theater’s performances to Main Street, creating an engaging connection with the surrounding district and community. An upgraded marquee, along with digital signage around the building, will offer a dynamic façade, showcasing upcoming performances and events while pulling visitors into the heart of the Theater District.
In November of 2024, a long-term agreement was announced to make Shea’s 710 Theatre the new home for MusicalFare Theatre. The partnership, which starts this fall, will increase active days at Shea’s 710 Theatre by 50 percent, adding 100 performances by MusicalFare on the main theatre and lounge cabaret stages.

Architecture, planning, and design for the project has been led by Carmina Wood Design, who bring vast experience in the redevelopment of historic properties and expertise in creative functionality.
“Carmina Wood Design is humbled to be entrusted with the renovation of this iconic Buffalo landmark, and we are thrilled to contribute to the ambitious plans Shea’s Buffalo has for the Theater District,” said Steve Carmina, President & CEO of Carmina Wood Design.
The construction management of 710 Theatre is under the purview of Buffalo Construction Consultants (BCC). Work is now underway and is scheduled for completion by the end of this year. Performances will continue while construction is underway. Formerly home to the acclaimed Studio Arena Theatre and originally built as the Palace Burlesque, Shea’s Performing Arts Center acquired Shea’s 710 Theatre in 2011.
This is the first of several investments planned on the Shea’s campus and throughout the Theatre District as Shea’s Buffalo Theatre launches its 100th anniversary celebration. Those projects include an accessibility addition to Shea’s Buffalo, landscaping and lighting improvements along Curtain-Up Alleyway, and possible additional floors on the building housing Smith Theatre to include residential or hotel space.
